MES for high-mix, low-volume discrete manufacturers

Smarter manufacturing starts on the shop floor.

ProcessIQ is the Manufacturing Execution System (MES) built for discrete manufacturers who make complex products with many variants. We put the right work instructions in front of every operator, and turn every step into critical data that drives better business decisions.

  1. Shop floor

    One master work instruction, so operators build the right variant every time

  2. Production management

    Serials, torque values and test results captured as the work happens

  3. Boardroom

    Planned versus actual across every plant, in one live view owners can act on

Proven on real shop floors

Customer results and our track record

800+

Frequently changing SKUs managed

Georg Fischer

20 min

Saved in admin every day

ProPhotonix

90%

Of 900+ legacy instructions migrated

Grass Valley

100%

Customer loyalty

0% churn over the last 12 months

ProcessIQ customers

Who we serve

Complex products. Many variants. Your sector.

ProcessIQ is built for discrete manufacturers in demanding, regulated and fast-changing sectors.

The problem we solve

Your shop floor isn’t sure which variant to build. Your boardroom can’t see what was built.

Every new variant adds confusion. Operators hunt through paper build packs for the right version. Quality managers can’t prove how each unit was built. Production managers lose tribal knowledge when people move on. And the boardroom can’t see where production is working or failing. Together, they create a hidden factory: lost time, rework and capacity that your business pays for but can’t see.

The cost of standing still

5–15%

in lost revenue

The cost of poor quality, before any compliance penalties.

<70%

on-time delivery

Typical when production runs without live data, leading to expediting and missed deadlines.

30%+

of high-mix products mispriced

Without job-level cost visibility, complex variants are rarely priced right.

Representative industry benchmarks for high-mix, low-volume discrete manufacturing without an MES. Sources: MPI Group MES Industry Survey, Aberdeen Group manufacturing studies, APQC benchmarking.

TodayWith ProcessIQ
  • Paper build packs and outdated revisions on the line Every operator on the right instruction, revision-controlled
  • Every new variant means another document to write and maintain One master instruction, configured across every variant
  • Quality issues discovered at final test, or by the customer Results captured at every stage, issues resolved at the station
  • Plant data rekeyed into spreadsheets for the month-end report Operational and financial data, live, from every plant
  • MES projects that stall on integration, training and cost Live in weeks, not months. ISA-95 aligned, using the instructions you already have

How we’re different

Most MES projects stall before they deliver. We built ProcessIQ so yours doesn’t.

77%

of manufacturers with an MES can’t fully integrate it

The reasons are almost always the same, and here’s how we fix them.

Source: Rockwell Automation survey of 1,560 manufacturers across 17 countries, July 2026, reported by Manufacturing Dive.

01 · Why MES projects fail

Built to spec, not shop floor reality

Scope set by IT teams and vendors can’t handle real variants, shift handovers or exceptions, so every gap becomes costly customisation.

Our answer

Configure, don’t customise

ProcessIQ is built for high-mix, low-volume production. Configure one master instruction for every variant, and bring your existing PDF instructions across with AI Ingestion.

02 · Why MES projects fail

The shop floor routes around it

When a system gets in the way, paper and spreadsheets creep back, and two versions of the truth appear.

Our answer

Operator-first

Clear, visual, step-by-step instructions and role-based guided set-up, so operators trust the system and paper stays gone.

03 · Why MES projects fail

Stranded site by site

Pilots stay pilots, with different data at every plant and no link to ERP, so leaders never get the visibility they paid for.

Our answer

Connected from day one

ISA-95 aligned integration from edge devices to your ERP, with one consistent data model across every site.

Live in weeks, not months. Start where the pain is greatest, then add lines and plants as you go.

Built for the whole team

From the operator’s next step to the board’s next decision.

Keep every build on the right instruction.

  • One master work instruction, configured across every variant
  • Production orders tracked through the line, so orders go out on time and issues are resolved fast
  • Version control, so every operator is on the right instruction, every time
A ProPhotonix operator following digital work instructions on screen at his workstation
20 minadmin saved per day
From a compliance perspective, the biggest benefit is control, control, control.
“ProcessIQ eliminates wasted time. Anyone can use the tool.”
Georg Fischer · 800+ SKUs managed under frequent change
Read the story →
“It has been a relief to implement something that has not created issues.”
Grass Valley · 90% of 900+ instructions migrated in under 8 months
Read the story →

Editions and pricing

Clear pricing, upfront. No surprises.

Standard

From
£TBC
per month
Deployment: SaaSAvailable from H1 2027

Everything you need to start your MES journey, digital work instructions, version control, and traceability from day one.

Compare all features →

Professional

From
£716
per month
Deployment: On-premisesSaaS from H1 2027

For growing manufacturers ready to add automation, reporting and operational efficiency to their MES foundation.

Compare all features →

Enterprise

From
£2,208
per month
Deployment: On-premises or air-gappedSaaS from H1 2027

Advanced MES capabilities for organisations and groups ready to unlock the full power of manufacturing intelligence.

Compare all features →

A partner, not just a supplier

Ready to unlock your hidden factory?

Founded by engineers. Honest about fit, transparent on price, and accountable from go-live onwards.